arrow_back अभ्यास
Phase 10 • Week 48

Close the Gaps, Second Full Self-Test

verified_user

Weekly Production Deliverable

Target Output
Deliverable: Every gap from Week 47's mocks addressed. All three Spring Boot projects refactored to a consistent, portfolio-ready standard. A second closed loop on paper-reading.
Weeks: W46 W47 W48 Active W49 W50

Monday

0 / 2 done
DSA Redo hardest problem per topic
Arrays, Hashing, Binary Search
1.5h
AI/ML Research Paper: Modern RAG / Agents
Read "Retrieval-Augmented Generation for Knowledge-Intensive NLP Tasks" (Lewis et al.) or current MCP research; connect concepts directly to capstone
2.5h

Tuesday

0 / 2 done
DSA Redo hardest problem per topic
Linked List, Recursion, Bit Manipulation
1.5h
CORE Core CS Rapid-Fire Blitz 1: LLD & HLD
5 rapid-fire questions from LLD (SOLID, Design patterns) & 5 from HLD (Scaling, caching, consistency, message queues) without notes
2.5h

Wednesday

0 / 2 done
DSA Redo hardest problem per topic
Greedy, Sliding Window, Stack/Queue
1.5h
AI/ML Paper Synthesis & Architecture Enhancement
Write up technical takeaways from paper; evaluate whether techniques can optimize capstone
2.5h

Thursday

0 / 2 done
DSA Redo hardest problem per topic
Binary Trees, BST, Heaps
1.5h
CORE Core CS Rapid-Fire Blitz 2: OOPs & DBMS/SQL
5 questions from OOPs & 5 questions from DBMS/SQL + solve 5 SQL Situational Questions cold
2.5h

Friday

0 / 2 done
DSA Redo hardest problem per topic
Graphs, DP
1.5h
AI/ML Phase 9 Capstone Polish
Apply paper takeaways or bugfixes to Phase 9 Spring AI capstone; final code clean-up pass
2.5h
Weekend High-Load Execution • 8.0h Daily Deep Focus Lab

Saturday

0 / 3 done
DSA Full mixed timed contest (every topic drawn at random)
1.5h
AI/ML Full-Stack Placement Mock 5: Capstone & GenAI Architecture (4.0h)
4-hour deep defense of your Spring AI Capstone: RAGAS evaluation metrics, pgvector indexing, and MCP server security.
4.0h
JAVA Backend Remediation 1: Persistence & Concurrency
Fix gaps identified in Week 47 mock: refine JPA repository queries, thread safety in services, Docker setup
2.5h

Sunday

0 / 3 done
DSA Full DSA self-test across all phases
1.5h
AI/ML Gap Closing & Weakness Elimination Drill (4.0h)
Spaced repetition on any questions stumbled on during Mocks 1–5; refine mental models and rapid recall.
4.0h
JAVA Backend Remediation 2: Microservices & Documentation
Polish Phase 8 Kafka microservice setup; ensure all 3 backend projects have clean, professional READMEs
2.5h
edit_note

Week 48 Technical Notes & Journal

#LeetCode #Java #DSA #Week48